JoeyGlide 2026

Benalla, Australia,   January 19, 2026 – January 25, 2026

Task 4, Joey, January 23, 2026

Task duration: 2:50:00
Task version: Start gate open 13:52 (v2)
Turnpoint Distance Direction Observation zone
174FINISH EAST 1.47 km 272.4° Line 10.00 km (Radius 5.00 km)
020Bobinawarrah 42.83 km 88.0° Cylinder R=10.00 km
055Dowdle Swamp 63.72 km 319.0° Cylinder R=10.00 km
078Katunga 53.23 km 282.4° Cylinder R=15.00 km
147Tamleugh Bridge 67.31 km 167.2° Cylinder R=7.00 km
000Benalla A/D 29.27 km 82.7° Cylinder R=5.00 km
Total: 198.42 km  /  316.32 km  (256.37 km)

Task notes

Marshalling RWY 08L
Grid Open: 1145 | Grid Close: 1230
Grid Order: E, A, B, C, D
First Launch: 1240 (COACH) | 1315 (COMP)
Relights RWY 35R
Landing: Expect RWY 08L
Pre-start height limit: 6000ft MSL
Minimum Finish Height: 1365ft MSL (800ft AGL)
Benalla CTAF: 125.60 MHz
Safety Frequency: 122.025 MHz
EMERGENCY SAR Frequency: 121.5 MHz
James Nugent 0400 235 815
Kirk Amos 0437 043 664